Click on the button below to view the minutes from this meeting. The document is stored as a PDF document which can be viewed online, or downloaded and saved.  Where applicable an appendices document (PDF) has been added which may contain additional supporting documents from this meeting.

If there is an asterisk symbol * on the button, the document(s) for this meeting have not been published yet.

Search Terms
This area contains text from the agenda of the meeting and other information to facilitate searches on this website. Please refer to the Agenda or Minutes/ Report buttons above if you are looking for something.

CHEPPING WYCOMBE PARISH COUNCIL
WORKS & SERVICES COMMITTEE
“Cherish the past, adorn the present, construct for the future”

Report of the meeting held on Thursday 6 October 2022 commencing at 7.30pm
in the Council Chamber, Cock Lane, Tylers Green, High Wycombe, Bucks HP10 8DS

Present: Cllr R Wilks – Vice-chairman Cllr A Barron Cllr J Gurney Cllr C Jordan
Cllr L Johncock Cllr D Johncock (ex officio)

Also present: none

WS/22/013 Apologies for absence
Cllr C Dodds – holiday, Cllr K Wood – family, Cllr S Herron – work, Cllr J Herschel – medical,
Cllr S Barrett – work

WS/22/014 Declarations of members’ interests in Items on the agenda
There were none.

WS/22/015 Delegated Action
Members were asked to note that since the last committee meeting in June the chairman of committee and clerk had instigated the following under delegated actions;
• Grab rail in the warden’s bathroom at a cost of £114.95

WS/22/016 Committee Projects
1 Office Complex Refurbishment
Members were asked to note that the drawings had been approved by Building Control. Members were asked to note that the replacement security system had been installed at a cost of £3,100.
It was noted that the security company had to be called out because the lack of internet at the office was causing it to reset itself.

WS/22/017 Cemeteries
1 Cock Lane Cemetery
Members were asked to note that signs had been put in the cemetery to advise walkers of the steep drops if leaving the footpath.

2 Altona Road Cemetery
Members were asked to note that the bench and plaque in memory of Cllr Kin had been delivered. Our Grounds Team and Mr Godliman would be installing it within the next 6 weeks.

3 Hammersley Lane Garden of Rest
Members were asked to note that the works to redo the path with self-binding gravel had been completed at a cost of £4,600.

Members were asked to note that a new database had been developed of all the graves. The data includes plot number, names of grave occupants, date of ERoB and name of ERoB holder. The next stage is to take a photo of each grave and upload them to the database.
The clerk and deputy clerk were thanked and commended for the work involved.

4 St Margaret’s Churchyard
Members were asked to note that the work to repair the brick piers had been completed at a cost of £350.00.

WS/22/018 War Memorial – Flackwell Heath
Members were asked to note that, following the recent site visit, we had published an article in the FH Grapevine newsletter looking for a local artist to paint a poppy on the drain cover. An artist had been found and would be starting the work soon. We would be covering the cost of their materials, approximately £192.
It was noted that proper preparation of the drain cover was required before commencing the artwork.

WS/22/019 Royal Mail bag drop boxes
Members were asked to note that we had received a further letter from Royal Mail stating that the lead time for removing the boxes is 16-20 weeks. A follow up would be done if the date of 8 November is not adhered to.

WS/22/020 FH Broxap bins
Members were asked to note that the deputy clerk had written to Buckinghamshire Council asking them to refurbish our green bins and stating that we were prepared to make a financial contribution towards the refurbishment. A reply had been received stating that it would be passed on to the Waste team. This would be followed up if a member of the Waste team doesn’t contact us shortly.

WS/22/021 LED Footway Lighting
Members were asked to note that three lamp columns had been damaged in the last four months. One had been straightened but the other two would need replacing. We are trying to claim through the drivers’ insurance companies for these two.

WS/22/022 Japanese Knotweed
Members were asked to note that Japanese Knotweed had been discovered at the Flackwell Heath Community Centre. We have agreed in principle with the Flackwell Heath Community Association to pay for the cost of a 5-year management plan amounting to £2,250.00 over 3 years.
Members were asked to consider and, if so minded, approve the payment of the management plan.
It was RESOLVED that;
The 5-year management plan be approved. The amount of £2,250.00 would be paid via a 3 year staged payment plan.
It was noted that approval would need to be sought from the neighbour alongside the Flackwell Heath Community Centre as it appears that the Japanese Knotweed extended onto their property.
It was noted that the deputy clerk had been in contact with Wycombe Heights Golf Club who now have a contractor dealing with the Japanese Knotweed at the club.

WS/22/023 Defibrillator
Members were asked to consider and, if so minded, approve the purchase of a cabinet for the defibrillator at Loudwater School at an estimated cost of £455. The council had previously agreed that, while we would not purchase or adopt PADs, we would support their maintenance and provide cabinets enabling them to be available to all members of the public. An offer to remove and fix the PAD in the new cabinet without charge would be made by Cllr Dodds to the headmistress if approved.
It was RESOLVED that;
The estimated cost of £455.00 be approved.

WS/22/024 Heath End Common
Members were asked to note that, following the recent site visit, wooden posts would be installed by our Grounds Team to prevent motorists parking on our land.

WS/22/025 Committee Finances
Members were asked to note the committee’s income and expenditure to Period 5 (August).
It was noted that the expenditure for Vehicle Maintenance was high. Apart from the MOT and full service, the Isuzu had needed the air conditioner recharged, new rear shoes and drum as well as needing the windscreen wiper jets and seat belts being cleaned out. The Ford Transit had needed its injectors replaced.
It was noted that money was being put aside each year should any vehicle need to be replaced in the future.

WS/22/026 Questions from committee members and the public
There were none.

WS/22/027 Accounts for payment
Accounts for payment were circulated at the meeting for consideration by councillors.
It was RESOLVED that;
the accounts for payment be approved and cheques numbered 10918 to 10927 be signed and direct debits to Shell (Fuel Card Services) and Salix Finance Ltd be approved for payment.

The chairman of committee thanked members for their attendance and closed the meeting at 8.05pm.

Date and Time of next meeting: Thursday 17 November 2022 at 7.30pm

Signed: Dated:

 

CWPC
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.